TOP-SECRET-Fukushima Daiichi NPS Unit 4 Damage Photos


[Image]

[Image]

1 – Rebar deformed upward[Image]
2 – Floor curled up[Image]
3 – Floor pushed up[Image]
4- Wire mesh, inlet of the air-conditioning at Reactor Well was bent to the reverse direction[Image]
5 – Wire mesh, inlet of the air-conditioning at Spent Fuel Pool was bent to the reverse direction[Image]

[Image]

6 – Rubbles from air-conditioning ducts[Image]
7- Rubbles from air-conditioning ducts[Image]
8 – [Photo shown in diagram not provided, instead No. 9 was duplicated.]
9 – Rubbles from air-conditioning ducts[Image]
10 – Rubbles from air-conditioning ducts[Image]
11 – Rubbles from air-conditioning ducts (no air-conditioning ducts above)[Image]
12 – The original place of installation of air-conditioning ducts[Image]

[Image]

13 – Damages to the floor[Image]
14 – Floor pushed down (in front is rubbles from air-conditioning ducts)[Image]
15 – Rubbles from air-conditioning ducts[Image]
16 – Rubbles from air-conditioning ducts[Image]
17 – Rubbles from air-conditioning ducts[Image]