Applications to develop a structure New York City give an Items Required rundown of reports to be submitted for assessment and endorsement by the organization. These things are ordered under Application (APP) toward the begin to Permit (PER) to begin development to Sign-Off (SGN) toward the end for endorsement of conclusive fulfillment of the task:
| Premises:82012AVENUEMANHATTAN JobNo:120481246 BIN:1089709 Block:1105 Lot:7501 JobType:NB–NEWBUILDING | ||||||
| 19OPENITEMSOF100REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 10/14/2010 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 10/14/2010 | |||
| EQUIPMENT USE PERMITS | N | SGN | 10/14/2010 | |||
| SITE SURVEY: FINAL | N | SGN | 10/14/2010 | |||
| BPP: FINAL SIGNOFF | N | SGN | 10/14/2010 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 10/14/2010 | |||
| STREET TREE SIGNOFF | N | SGN | 10/14/2010 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 10/14/2010 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 10/14/2010 | |||
| VERIFY TAX LOT | N | SGN | 10/14/2010 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 10/14/2010 | |||
| VIOLATIONS SEARCH | N | SGN | 10/14/2010 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 10/14/2010 | |||
| FOLDER REVIEW | N | SGN | 10/14/2010 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 08/12/2011 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 01/06/2012 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 04/12/2012 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 04/12/2012 |
CONSTRUCTION-INSP-UPDATE-IS-REQUIRED-FOR-ALL-EXPIRED- FLOORS
N SGN 11/23/2020
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Ease/Deed/FeeText
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.
| Premises:432PARKAVENUEMANHATTAN JobNo:120628776 BIN:1088817 Block:1292 Lot:7502 JobType:NB–NEWBUILDING | ||||||
| 30OPENITEMSOF122REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 03/16/2011 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 03/16/2011 | |||
| STREET TREE SIGNOFF | N | SGN | 03/16/2011 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 03/16/2011 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 03/16/2011 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 03/16/2011 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 03/16/2011 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 03/16/2011 | |||
| VERIFY TAX LOT | N | SGN | 03/16/2011 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 03/16/2011 | |||
| VIOLATIONS SEARCH | N | SGN | 03/16/2011 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 03/16/2011 | |||
| FOLDER REVIEW | N | SGN | 03/16/2011 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 04/29/2011 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 04/29/2011 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 04/29/2011 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 04/29/2011 | |||
| BOILER (BL) SIGNOFF | N | SGN | 02/13/2012 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 02/13/2012 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 02/13/2012 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 02/13/2012 | |||
| STEEL AFFIDAVIT- FINAL | T | SGN | 02/13/2012 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 10/27/2015 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 10/27/2015 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 10/27/2015 | |||
| FIRE SUPPRESSION SYSTEM (FP) SIGNOFF | N | SGN | 10/27/2015 | |||
| TRI’S THAT-NOT-ENTER-FIRST-TEMP-NEEDEDFOR-RENEWAL. | N | SGN | 11/10/2015 | |||
| SCHEDULE-A-DOES-NOT-DISPLAY-6TH-FL-TERRACE | N | SGN | 05/02/2016 | |||
| UPDATE-CONSTRUCTION-SIGN-OFF-FOR-ALL-FLRS-EXPIRED | N | SGN | 07/12/2017 | |||
| PROVIDE-CONSTRUCTION-UPDATE-FOR-ALL-FLRS-LISTED-ON- PREVIOUS-TCO-THAT-HAVE-EXPIRED | N | SGN | 12/09/2020 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
| Premises:400PARKAVENUESOUTHMANHATTAN JobNo:121181808 BIN:1089699 Block:857 Lot:7503 JobType:NB–NEWBUILDING | ||||||
| 21OPENITEMSOF104REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 02/07/2012 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 02/07/2012 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 02/07/2012 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 02/07/2012 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 02/07/2012 | |||
| VERIFY TAX LOT | N | SGN | 02/07/2012 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 02/07/2012 | |||
| VIOLATIONS SEARCH | N | SGN | 02/07/2012 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 02/07/2012 | |||
| FOLDER REVIEW | N | SGN | 02/07/2012 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 02/23/2012 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 02/23/2012 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 02/23/2012 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 02/23/2012 | |||
| MECHANICAL (MH) SIGNOFF | N | SGN | 02/23/2012 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 02/23/2012 | |||
| EQUIPMENT USE PERMITS | N | SGN | 02/23/2012 | |||
| PLUMBING (PL) SIGNOFF | N | SGN | 02/23/2012 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 02/23/2012 | |||
| EMERGENCY POWER SYSTEMS (GENERATORS)APPL | T | SGN | 03/19/2012 |
CLARIFICATION-FOR-PW-7-DROPPED-OFF-ON-03/04/19-IS-REQUIRED N SGN 03/04/2019
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.
| Premises:125GREENWICHSTREETMANHATTAN JobNo:121183799 BIN:1090832 Block:51 Lot:14 JobType:NB–NEWBUILDING | ||||||
| 26OPENITEMSOF27REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 06/05/2012 | |||
| SITE SURVEY: FINAL | N | SGN | 06/05/2012 | |||
| BPP: FINAL SIGNOFF | N | SGN | 06/05/2012 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 06/05/2012 | |||
| STREET TREE SIGNOFF | N | SGN | 06/05/2012 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 06/05/2012 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 06/05/2012 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 06/05/2012 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 06/05/2012 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 06/05/2012 | |||
| VERIFY TAX LOT | N | SGN | 06/05/2012 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 06/05/2012 | |||
| VIOLATIONS SEARCH | N | SGN | 06/05/2012 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 06/05/2012 | |||
| FOLDER REVIEW | N | SGN | 06/05/2012 | |||
| BSA VARIANCE | N | SGN | 07/03/2012 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 07/03/2012 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 07/03/2012 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 07/03/2012 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 07/03/2012 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 07/03/2012 | |||
| EQUIPMENT USE PERMITS | N | SGN | 07/03/2012 | |||
| BOILER (BL) SIGNOFF | N | SGN | 07/03/2012 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 07/03/2012 | |||
| NYCECC ANALYSIS ACCEPTED W/CONDITION SUBJECT TO ENERGY AUDIT FOR LIGHTING DESIGN | T | SGN | 09/08/2016 | |||
| FILE ALT APPLICATIONS FOR EXISTING BLDGS ON LOT TO AMEND METES AND BOUNDS | T | SGN | 10/06/2016 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
| Premises:545WEST30STREETMANHATTAN JobNo:121184208 BIN:1089411 Block:702 Lot:7502 JobType:NB–NEWBUILDING | ||||||
| 24OPENITEMSOF103REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 01/08/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 01/08/2014 | |||
| BPP: FINAL SIGNOFF | N | SGN | 01/08/2014 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 01/08/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 01/08/2014 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 01/08/2014 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 01/08/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 01/08/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 01/08/2014 | |||
| VERIFY TAX LOT | N | SGN | 01/08/2014 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 01/08/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 01/08/2014 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 01/08/2014 | |||
| FOLDER REVIEW | N | SGN | 01/08/2014 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 02/20/2014 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 02/20/2014 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 02/20/2014 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 02/20/2014 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 02/20/2014 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 02/20/2014 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 02/20/2014 | |||
| DEP SEWER CONNECTION APPROVAL | T | SGN | 04/07/2015 | |||
| ELEVATOR OBJ: OPEN PVT VIO | N | SGN | 02/01/2021 | |||
| $100 FEE FOR TEMP C.O | N | SGN | 02/05/2021 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.
| Premises:216CENTRALPARKSOUTHMANHATTAN JobNo:121184592 BIN:1090184 Block:1030 Lot:7501 JobType:NB–NEWBUILDING | ||||||
| 22OPENITEMSOF100REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 01/27/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 01/27/2014 | |||
| BPP: FINAL SIGNOFF | N | SGN | 01/27/2014 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 01/27/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 01/27/2014 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 01/27/2014 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 01/27/2014 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 01/27/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 01/27/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 01/27/2014 | |||
| VERIFY TAX LOT | N | SGN | 01/27/2014 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 01/27/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 01/27/2014 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 01/27/2014 | |||
| FOLDER REVIEW | N | SGN | 01/27/2014 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 01/30/2014 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 01/30/2014 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 01/30/2014 | |||
| COFO-OBJ-AUDIT-CONDITION-PENDING | N | SGN | 08/15/2018 | |||
| $100-TCO-RENEWAL-FEE-IS-REQUIRED | N | SGN | 01/25/2021 | |||
| PROVIDE-CONSTRUCTION-INSP-UPDATE-IS-REUIRED-FOR-ALL- EXPIRED-FLOORS | N | SGN | 01/25/2021 | |||
| CONSTRUCTION-INSP-UPDATE-FOR-THE-65TH-FL-IS-REQUIRED- ALSO-SOME-FLRS-LISTED-OR-EXCLUSION-HAVE-VALID- CONSTRUCTION-SIGN-OFF-PLEASE-REVISE-PW-7-REQUEST-AND- RESUBMIT | N | SGN | 02/05/2021 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Ease / Deed / Fee Text
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or
| Premises:240SOUTHSTREETMANHATTAN JobNo:121185528 BIN:1089771 Block:248 Lot:7501 JobType:NB–NEWBUILDING | ||||||
| 25OPENITEMSOF102REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 04/29/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 04/29/2014 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 04/29/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 04/29/2014 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 04/29/2014 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 04/29/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 04/29/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 04/29/2014 | |||
| VERIFY TAX LOT | N | SGN | 04/29/2014 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 04/29/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 04/29/2014 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 04/29/2014 | |||
| FOLDER REVIEW | N | SGN | 04/29/2014 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 07/03/2014 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 07/03/2014 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 07/03/2014 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 07/03/2014 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 07/03/2014 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 07/03/2014 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 07/03/2014 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 07/03/2014 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 07/03/2014 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 07/03/2014 | |||
| CONSTRUCTION-&-PL-SIGN-OFFS-SPECIFY-(NORTH-&-SOUTH-APTS)- SCHEDULE-A-DOES-NOT-DISPLAY-(NORTH-&-SOUTH-APTS)-REMEDY | N | SGN | 06/13/2019 |
CONSTRUCTION-SIGN-OFF-FOR-3RD-FL-(STORAGE)-IS-REQUIRED N SGN 01/30/2020
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or
| Premises:43PARKPLACEMANHATTAN JobNo:121185635 BIN:1090860 Block:126 Lot:8 JobType:NB–NEWBUILDING | ||||||
| 28OPENITEMSOF28REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 05/12/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 05/12/2014 | |||
| BPP: FINAL SIGNOFF | N | SGN | 05/12/2014 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 05/12/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 05/12/2014 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 05/12/2014 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 05/12/2014 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 05/12/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 05/12/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 05/12/2014 | |||
| VERIFY TAX LOT | N | SGN | 05/12/2014 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 05/12/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 05/12/2014 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 05/12/2014 | |||
| FOLDER REVIEW | N | SGN | 05/12/2014 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 06/19/2014 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 06/19/2014 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 06/19/2014 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 06/19/2014 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 06/19/2014 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 06/19/2014 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 06/19/2014 | |||
| EQUIPMENT USE PERMITS | N | SGN | 06/19/2014 | |||
| BOILER (BL) SIGNOFF | N | SGN | 06/19/2014 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 06/19/2014 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 06/19/2014 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 06/19/2014 | |||
| FIRE ALARM TEST | N | SGN | 06/19/2014 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
| Premises:161MAIDENLANEMANHATTAN JobNo:121185680 BIN:1090257 Block:72 Lot:7502 JobType:NB–NEWBUILDING | ||||||
| 31OPENITEMSOF32REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 05/21/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 05/21/2014 | |||
| BPP: FINAL SIGNOFF | N | SGN | 05/21/2014 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 05/21/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 05/21/2014 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 05/21/2014 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 05/21/2014 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 05/21/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 05/21/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 05/21/2014 | |||
| VERIFY TAX LOT | N | SGN | 05/21/2014 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 05/21/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 05/21/2014 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 05/21/2014 | |||
| FOLDER REVIEW | N | SGN | 05/21/2014 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 07/31/2014 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 07/31/2014 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 07/31/2014 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 07/31/2014 | |||
| * FEMA FORM (81-31): ELEVATION CERTIFICATE | N | SGN | 07/31/2014 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 07/31/2014 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 07/31/2014 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 07/31/2014 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 07/31/2014 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 07/31/2014 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 07/31/2014 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 07/31/2014 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 07/31/2014 | |||
| FIRE ALARM TEST | N | SGN | 07/31/2014 | |||
| FEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34) | T | SGN | 09/17/2015 |
TEMPORARY FLOOD STAIR STORAGE ROOM: EMERGENCY FLOOD T SGN 09/18/2015
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
| Premises:435WEST31STREETMANHATTAN JobNo:121185760 BIN:1089664 Block:729 Lot:7502 JobType:NB–NEWBUILDING | ||||||
| 24OPENITEMSOF115REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 05/21/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 05/21/2014 | |||
| BPP: FINAL SIGNOFF | N | SGN | 05/21/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 05/21/2014 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 05/21/2014 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 05/21/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 05/21/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 05/21/2014 | |||
| VERIFY TAX LOT | N | SGN | 05/21/2014 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 05/21/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 05/21/2014 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 05/21/2014 | |||
| FOLDER REVIEW | N | SGN | 05/21/2014 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 07/18/2014 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 07/18/2014 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 07/18/2014 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 07/18/2014 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 07/18/2014 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 07/18/2014 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 07/18/2014 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 07/18/2014 | |||
| ENCROACHMENT ONTO SIDEWALK: DOT REVOCABL | T | SGN | 11/13/2015 | |||
| NO FCO CAN BE ISSUED UNTIL PL S/O IS OBTAINED FOR SEPARATE ALT #121187697 FOR TENANT BUILDOUT AT RETAIL LEVELS-MRZ | N | SGN | 01/17/2019 | |||
| ELEVATOR OBJ: OPEN BUILD ELEVATOR APPLICATION | N | SGN | 01/05/2021 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or
| Premises:151EAST49STREETMANHATTAN JobNo:121186028 BIN:1090524 Block:1304 Lot:7502 JobType:NB–NEWBUILDING | ||||||
| 16OPENITEMSOF77REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 06/20/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 06/20/2014 | |||
| BPP: FINAL SIGNOFF | N | SGN | 06/20/2014 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 06/20/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 06/20/2014 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 06/20/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 06/20/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 06/20/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 06/20/2014 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 06/20/2014 | |||
| FOLDER REVIEW | N | SGN | 06/20/2014 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 07/17/2014 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 07/17/2014 | |||
| PA TO BE FILED | T | SGN | 08/26/2016 | |||
| PW1A-ADD ATTENDANT PARKING NOTE | T | SGN | 08/26/2016 | |||
| REVISE MISSPELLINGS AND ADD LIVE LOAD AT GARAGE ENTRANCE TO BE CONFIRMED OR CORRECTED PRIOR TO RENEWAL | N | SGN | 12/31/2018 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.
NYCDepartmentofBuildings
B-SCANListofRequiredItems
| Premises:20HUDSONYARDSMANHATTAN J BIN:1088961 Block:702 Lot:7501 JobType:NB | |||||
| 30OPENITEMSOF180REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DCE |
| CERTIFICATE OF OCCUPANCY | N | SGN | 07/22/2014 | ||
| SITE SURVEY: FINAL | N | SGN | 07/22/2014 | ||
| BPP: FINAL SIGNOFF | N | SGN | 07/22/2014 | ||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 07/22/2014 | ||
| STREET TREE SIGNOFF | N | SGN | 07/22/2014 | ||
| FINAL PLUMBING SIGNOFF | N | SGN | 07/22/2014 | ||
| FINAL ELEVATOR SIGNOFF | N | SGN | 07/22/2014 | ||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 07/22/2014 | ||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 07/22/2014 | ||
| VERIFY TAX LOT | N | SGN | 07/22/2014 | ||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 07/22/2014 | ||
| VIOLATIONS SEARCH | N | SGN | 07/22/2014 | ||
| OPEN APPLICATIONS SEARCH | N | SGN | 07/22/2014 | ||
| FOLDER REVIEW | N | SGN | 07/22/2014 | ||
| DEP SEWER CONNECTION APPROVAL | T | SGN | 04/07/2015 | ||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 04/10/2015 | ||
| SPRINKLER (SP) SIGNOFF | N | SGN | 04/10/2015 | ||
| STANDPIPE (SD) SIGNOFF | N | SGN | 04/10/2015 | ||
| ELEVATOR JOB SIGNOFF | N | SGN | 04/10/2015 | ||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 04/10/2015 | ||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 04/10/2015 | ||
| DOB – ZONING DIAGRAM (ZD1) | T | SGN | 04/10/2015 | ||
| VERIFY-ALL-NECESSARY-PERMANENT-PL-SP-SD-ARE-SIGNED-OFF- AS-PER-JRQ | N | SGN | 02/14/2019 | ||
| $100-CORE-AND-SHELL-FEE-IS-REQUIRED | N | SGN | 02/20/2019 | ||
| VERIFY-PL-&-CONSTRUCTION-SIGN-OFFS-FOR-ALL-FLRS- REQUESTED | N | SGN | 02/20/2019 | ||
| SYSTEM-ERROR-AWAITING-BIS-TO-ISSUE-TCO-RENEWAL | N | SGN | 02/20/2019 | ||
| COFO-OBJ:-CLARIFICATION-REQUIRED-SCHEDULE-A-&-SUBMITTED- LATEST-COPY-OF-TCO-W/REQUESTED-CHANGES-DO-NOT-MATCH | N | SGN | 02/22/2019 | ||
| AWAITING-BIS-ASSISTANCE | N | SGN | 12/17/2020 | ||
| PRIOR TO RENEWAL REVISE THE SCHEDULE “A” TO SHOW 393 OCCUPANT LOAD ON THE(022 FL)-CAFE/DINING AREA (TOWER DISPLAY-35 FL. EAST) | N | SGN | 01/28/2021 | ||
a810-bisweb.nyc.gov/bisweb/BScanItemsRequiredServlet?rqiditemstatus=open&rqidpriortos=on&passjobnumber=121186251&allisn=&allbin=1088961… 1/2
| C/O OBJECTION: MUST SUBMIT REQUEST ASA TCO RENEWAL WITH CHANGES IN EFILE | N | SGN | 02/04/2021 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplayDisplayItemsRequiredPriorTo:
ApprovalPermit
Signoff
WhichItemsShouldBeDisplayed?
AllItems
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.
a810-bisweb.nyc.gov/bisweb/BScanItemsRequiredServlet?rqiditemstatus=open&rqidpriortos=on&passjobnumber=121186251&allisn=&allbin=1088961… 2/2
| Premises:107GREENWICHSTREETMANHATTAN JobNo:121186885 BIN:1090830 Block:51 Lot:7 JobType:NB–NEWBUILDING | ||||||
| 20OPENITEMSOF59REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 09/12/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 09/12/2014 | |||
| BPP: FINAL SIGNOFF | N | SGN | 09/12/2014 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 09/12/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 09/12/2014 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 09/12/2014 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 09/12/2014 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 09/12/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 09/12/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 09/12/2014 | |||
| VERIFY TAX LOT | N | SGN | 09/12/2014 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 09/12/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 09/12/2014 | |||
| FOLDER REVIEW | N | SGN | 09/12/2014 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 10/01/2014 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 10/01/2014 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 10/01/2014 | |||
| EQUIPMENT USE PERMITS | N | SGN | 10/01/2014 | |||
| OTCR FINAL ACCEPTANCE LETTER – ELEV. SMOKE CONTAINMENT SYSTEM | N | SGN | 12/22/2020 | |||
| C/O OBJECTION: TCO RENEWAL FEE DUE | N | SGN | 02/04/2021 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.
| Premises:440WEST33STREETMANHATTAN JobNo:121187713 BIN:1089974 Block:729 Lot:61 JobType:NB–NEWBUILDING | ||||||
| 35OPENITEMSOF38REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| ENVIRONMENTAL RESTRICTIONS – OER NOTICE OF SATISFACTION | T | SGN | 05/22/2017 | |||
| FEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34) | T | SGN | 05/22/2017 | |||
| CERTIFICATE OF OCCUPANCY | N | SGN | 05/22/2017 | |||
| SITE SURVEY: FINAL | N | SGN | 05/22/2017 | |||
| BPP: FINAL SIGNOFF | N | SGN | 05/22/2017 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 05/22/2017 | |||
| STREET TREE SIGNOFF | N | SGN | 05/22/2017 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 05/22/2017 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 05/22/2017 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 05/22/2017 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 05/22/2017 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 05/22/2017 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 05/22/2017 | |||
| VERIFY TAX LOT | N | SGN | 05/22/2017 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 05/22/2017 | |||
| VIOLATIONS SEARCH | N | SGN | 05/22/2017 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 05/22/2017 | |||
| FOLDER REVIEW | N | SGN | 05/22/2017 | |||
| FIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF | N | SGN | 01/31/2018 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 01/31/2018 | |||
| SEWER/HOUSE CON SIGNOFF: DEP HC 021 | N | SGN | 01/31/2018 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 01/31/2018 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 01/31/2018 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 01/31/2018 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 01/31/2018 | |||
| MECHANICAL (MH) SIGNOFF | N | SGN | 01/31/2018 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 01/31/2018 | |||
| EQUIPMENT USE PERMITS | N | SGN | 01/31/2018 | |||
| PLUMBING (PL) SIGNOFF | N | SGN | 01/31/2018 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 01/31/2018 | |||
| RESTRICTION: RESTRICTIVE DECLARATION | N | SGN | 01/31/2018 | |||
| NYCECC REVIEW BY ECC SENIOR STAFF OF ASBUILT CONDITIONS PRIOR TO EN2 SIGNOFF | T | SGN | 03/15/2019 | |||
| PAA PRIOR TO TCO TO CORRECT PW1 #8 FORTOTAL CONSTRUCTION F.A. | T | SGN | 03/20/2019 | |||
| PHASE ONE OER NOTICE TO PROCEED- HOTEL OCCUPANCY | N | SGN | 01/20/2021 |
PHASE TWO OER NOTICE TO PROCEED- RESTAURANT & RETAIL OCCUPANCY
N SGN 01/20/2021
| Premises:2VANDERBILTAVENUEMANHATTAN JobNo:121189828 BIN:1090825 Block:1277 Lot:27 JobType:NB–NEWBUILDING | ||||||
| 33OPENITEMSOF58REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| ENVIRONMENTAL RESTRICTIONS – OER NOTICE OF SATISFACTION | T | SGN | 10/30/2015 | |||
| FEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34) | T | SGN | 10/30/2015 | |||
| CERTIFICATE OF OCCUPANCY | N | SGN | 10/30/2015 | |||
| SITE SURVEY: FINAL | N | SGN | 10/30/2015 | |||
| BPP: FINAL SIGNOFF | N | SGN | 10/30/2015 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 10/30/2015 | |||
| STREET TREE SIGNOFF | N | SGN | 10/30/2015 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 10/30/2015 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 10/30/2015 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 10/30/2015 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 10/30/2015 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 10/30/2015 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 10/30/2015 | |||
| VERIFY TAX LOT | N | SGN | 10/30/2015 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 10/30/2015 | |||
| VIOLATIONS SEARCH | N | SGN | 10/30/2015 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 10/30/2015 | |||
| FOLDER REVIEW | N | SGN | 10/30/2015 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 11/06/2015 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 11/06/2015 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 11/06/2015 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 11/06/2015 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 11/06/2015 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 11/06/2015 | |||
| EQUIPMENT USE PERMITS | N | SGN | 11/06/2015 | |||
| RESTRICTION: EASEMENT AGREEMENT | T | SGN | 11/06/2015 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 11/06/2015 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 11/06/2015 | |||
| DEMOLITION SIGN-OFF | N | SGN | 05/31/2016 | |||
| NYCECC TR8 INSPECTOR TO SUBMIT WINDOWPERFORMANCE CERTIFICATE INDICATINGALL FENESTRATION U-FACTORS MEET OR EXCEED VALUES INDICATED ON 3/31/17 EN-1 | T | SGN | 04/03/2017 | |||
| APPLICANT TO PROVIDE EN-2 INDICATINGFINAL EXTERIOR LIGHTING TO MEET ORBE LESS THAN VALUES SHOWN ON 3/31/17EN-1 AND PLANS | T | SGN | 04/03/2017 | |||
| PRIOR TO TCO RENEWAL PROVIDE STATUS UPDATE FOR ALL PARTIAL TR-1S. | N | SGN | 01/27/2021 |
PRIOR TO RENEWAL REVISE THE SCHEDULE “A” N SGN 01/27/2021
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner Some items may not be required for your specific work filing.
| Premises:43BROADSTREETMANHATTAN JobNo:121190772 BIN:1088632 Block:25 Lot:7 JobType:NB–NEWBUILDING | ||||||
| 31OPENITEMSOF33REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 06/24/2016 | |||
| SITE SURVEY: FINAL | N | SGN | 06/24/2016 | |||
| BPP: FINAL SIGNOFF | N | SGN | 06/24/2016 | |||
| STREET TREE SIGNOFF | N | SGN | 06/24/2016 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 06/24/2016 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 06/24/2016 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 06/24/2016 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 06/24/2016 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 06/24/2016 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 06/24/2016 | |||
| VERIFY TAX LOT | N | SGN | 06/24/2016 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 06/24/2016 | |||
| VIOLATIONS SEARCH | N | SGN | 06/24/2016 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 06/24/2016 | |||
| FOLDER REVIEW | N | SGN | 06/24/2016 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 06/28/2016 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 06/28/2016 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 06/28/2016 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 06/28/2016 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 06/28/2016 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 06/28/2016 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 06/28/2016 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 06/28/2016 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 06/28/2016 | |||
| EQUIPMENT USE PERMITS | N | SGN | 06/28/2016 | |||
| BOILER (BL) SIGNOFF | N | SGN | 06/28/2016 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 06/28/2016 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 06/28/2016 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 06/28/2016 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 06/15/2017 |
NYCECC COMPLETE REVIEW FOR PAA T SGN 07/08/2019
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Ease / Deed / Fee Text
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
OpenItemsOnly
| Premises:41310AVENUEMANHATTAN JobNo:121191414 BIN:1090274 Block:705 Lot:39 JobType:NB–NEWBUILDING | ||||||
| 39OPENITEMSOF41REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| ENVIRONMENTAL RESTRICTIONS – OER NOTICE OF SATISFACTION | T | SGN | 01/10/2017 | |||
| CERTIFICATE OF OCCUPANCY | N | SGN | 01/10/2017 | |||
| SITE SURVEY: FINAL | N | SGN | 01/10/2017 | |||
| BPP: FINAL SIGNOFF | N | SGN | 01/10/2017 | |||
| STREET TREE SIGNOFF | N | SGN | 01/10/2017 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 01/10/2017 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 01/10/2017 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 01/10/2017 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 01/10/2017 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 01/10/2017 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 01/10/2017 | |||
| VERIFY TAX LOT | N | SGN | 01/10/2017 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 01/10/2017 | |||
| VIOLATIONS SEARCH | N | SGN | 01/10/2017 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 01/10/2017 | |||
| FOLDER REVIEW | N | SGN | 01/10/2017 | |||
| FIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF | N | SGN | 01/12/2017 | |||
| TAX LOT: FINAL LOT NUMBER ISSUED | N | SGN | 01/12/2017 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 01/12/2017 | |||
| SEWER/HOUSE CON SIGNOFF: DEP HC 021 | N | SGN | 01/12/2017 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 01/12/2017 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 01/12/2017 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 01/12/2017 | |||
| GASOLINE TANK SIGNOFF | N | SGN | 01/12/2017 | |||
| MECHANICAL (MH) SIGNOFF | N | SGN | 01/12/2017 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 01/12/2017 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 01/12/2017 | |||
| EQUIPMENT USE PERMITS | N | SGN | 01/12/2017 | |||
| PLUMBING (PL) SIGNOFF | N | SGN | 01/12/2017 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 01/12/2017 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 01/12/2017 | |||
| CONSTRUCTION (OT) SIGNOFF | N | SGN | 01/12/2017 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 01/12/2017 | |||
| STEEL AFFIDAVIT- FINAL | T | SGN | 01/12/2017 | |||
| HOUSE CONNECTION SIGNOFF | T | SGN | 01/12/2017 | |||
| DOB – ZONING DIAGRAM (ZD1) | T | SGN | 01/12/2017 | |||
| WELDERS AFFIDAVIT | T | SGN | 01/12/2017 | |||
| OTCR FINAL ACCEPTANCE LETTER | T | SGN | 02/12/2018 |
PLACE OF ASSEMBLY (PA) SIGNOFF N SGN 06/04/2018
| Premises:550WEST33STREETMANHATTAN JobNo:121192618 BIN:1091590 Block:702 Lot:7503 JobType:NB–NEWBUILDING | ||||||
| 25OPENITEMSOF74REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 01/28/2015 | |||
| SITE SURVEY: FINAL | N | SGN | 01/28/2015 | |||
| BPP: FINAL SIGNOFF | N | SGN | 01/28/2015 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 01/28/2015 | |||
| STREET TREE SIGNOFF | N | SGN | 01/28/2015 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 01/28/2015 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 01/28/2015 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 01/28/2015 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 01/28/2015 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 01/28/2015 | |||
| VERIFY TAX LOT | N | SGN | 01/28/2015 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 01/28/2015 | |||
| VIOLATIONS SEARCH | N | SGN | 01/28/2015 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 01/28/2015 | |||
| FOLDER REVIEW | N | SGN | 01/28/2015 | |||
| ENVIRONMENTAL RESTRICTIONS – OER NOTICE OF SATISFACTION | T | SGN | 03/31/2015 | |||
| DEP SEWER CONNECTION APPROVAL | T | SGN | 04/07/2015 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 04/17/2015 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 04/17/2015 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 04/17/2015 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 04/17/2015 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 04/17/2015 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 04/17/2015 | |||
| EN2 REVIEW REQUIRED BY ECC SENIOR STAFF | T | SGN | 11/02/2017 |
PRIOR TO TCO RENEWAL OR FINAL CO, PLEASE SUBMIT OER NOS; CO/SMOKE DETECTORS CERTS OF INSTALL; FINAL TR1(S) AND TR8(S) OR STATUS REPORT.
N SGN 07/15/2019
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or
| Premises:128WILLIAMSTREETMANHATTAN JobNo:121192903 BIN:1090562 Block:77 Lot:15 JobType:NB–NEWBUILDING | ||||||
| 37OPENITEMSOF69REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 05/06/2015 | |||
| SITE SURVEY: FINAL | N | SGN | 05/06/2015 | |||
| BPP: FINAL SIGNOFF | N | SGN | 05/06/2015 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 05/06/2015 | |||
| STREET TREE SIGNOFF | N | SGN | 05/06/2015 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 05/06/2015 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 05/06/2015 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 05/06/2015 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 05/06/2015 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 05/06/2015 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 05/06/2015 | |||
| VERIFY TAX LOT | N | SGN | 05/06/2015 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 05/06/2015 | |||
| VIOLATIONS SEARCH | N | SGN | 05/06/2015 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 05/06/2015 | |||
| FOLDER REVIEW | N | SGN | 05/06/2015 | |||
| FIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF | N | SGN | 08/12/2016 | |||
| ADDRESS: NEW HOUSE NUMBER APPROVED | N | SGN | 08/12/2016 | |||
| TAX LOT: FINAL LOT NUMBER ISSUED | N | SGN | 08/12/2016 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 08/12/2016 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 08/12/2016 | |||
| BPP-PARKS: PLANT NEW TREE | T | SGN | 08/12/2016 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 08/12/2016 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 08/12/2016 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 08/12/2016 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 08/12/2016 | |||
| EQUIPMENT USE PERMITS | N | SGN | 08/12/2016 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 08/12/2016 | |||
| LIGHT & AIR EASEMENT AGREEMENT AGAINSTLOT 24 | T | SGN | 08/15/2016 | |||
| NYCECC ANALYSIS | T | SGN | 04/03/2017 | |||
| LOT LINE WINDOW RESTRICTIVE DEC AS PERB.B. 2015-017 SECT V&A& TO BE FILED & RECORDED CRFN # TO BE INCLUDED ON SCHED”A”. | T | SGN | 11/03/2017 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 11/06/2017 | |||
| REVISE SCHED “A” @ 2ND FLR TO INDICATE SEPARATELY EACH OCCUPANT LOAD FOR RETAILAND ACCESSORY OUTDOOR TERRACE. FOR A TOTAL OF 264. | T | SGN | 11/06/2017 | |||
| COFO-NOTIFICATION-SEND-PROJECT-ADVOCATE-FOR-REVIEW | N | SGN | 10/05/2020 | |||
| COFO-NOTIFICATION-SEND-PROJECT-ADVOCATE-FOR-REVIEW | N | SGN | 10/28/2020 | |||
| $100 FEE FOR TEMP C.O | N | SGN | 11/05/2020 |
C/O OBJECTION: TCO RENEWAL FEE DUE N SGN 01/29/2021
| Premises:2RIVERSIDEBOULEVARDMANHATTAN JobNo:121192976 BIN:1089741 Block:1171 Lot:7512 JobType:NB–NEWBUILDING | ||||||
| 32OPENITEMSOF87REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 06/02/2015 | |||
| SITE SURVEY: FINAL | N | SGN | 06/02/2015 | |||
| BPP: FINAL SIGNOFF | N | SGN | 06/02/2015 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 06/02/2015 | |||
| STREET TREE SIGNOFF | N | SGN | 06/02/2015 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 06/02/2015 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 06/02/2015 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 06/02/2015 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 06/02/2015 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 06/02/2015 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 06/02/2015 | |||
| VERIFY TAX LOT | N | SGN | 06/02/2015 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 06/02/2015 | |||
| VIOLATIONS SEARCH | N | SGN | 06/02/2015 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 06/02/2015 | |||
| FOLDER REVIEW | N | SGN | 06/02/2015 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 09/04/2015 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 09/04/2015 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 09/04/2015 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 09/04/2015 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 09/04/2015 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 09/04/2015 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 09/04/2015 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 09/04/2015 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 09/04/2015 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 09/04/2015 | |||
| AMEND DOB – ZONING DIAGRAM (ZD1)PRIOR TO TCO TO SHOW ALL BUILDINGS ONTHE ZONING LOT | N | SGN | 11/18/2015 | |||
| FLOOD SHIELDS RESTRICTIVE DECLARATION | T | SGN | 01/12/2017 | |||
| ALSO-PROVIDE-PL-SIGN-OFF-FOR-SC1-(CONDO-STORAGE-AND-1ST- FL-(SERVICE-DELIVERY) | N | SGN | 10/31/2019 | |||
| ENVIRONMENTAL RESTRICTIONS – OER NOTICEOF SATISFACTION | T | SGN | 07/10/2020 | |||
| $100-TCO-RENEWAL-FEE-IS-REQUIRED | N | SGN | 01/21/2021 | |||
| CONSTRUCTION-INSP-UPDATE-IS-REQUIRED-FOR-ALL-FLRS- EXPIRED | N | SGN | 01/21/2021 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
| Premises:2815AVENUEMANHATTAN JobNo:121193136 BIN:1090386 Block:859 Lot:7504 JobType:NB–NEWBUILDING | ||||||
| 27OPENITEMSOF88REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 07/08/2015 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 07/08/2015 | |||
| CERTIFICATE OF OCCUPANCY | N | SGN | 07/08/2015 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 07/08/2015 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 07/08/2015 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 07/08/2015 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 07/08/2015 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 07/08/2015 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 07/08/2015 | |||
| SITE SURVEY: FINAL | N | SGN | 07/08/2015 | |||
| BPP: FINAL SIGNOFF | N | SGN | 07/08/2015 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 07/08/2015 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 07/08/2015 | |||
| STREET TREE SIGNOFF | N | SGN | 07/08/2015 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 07/08/2015 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 07/08/2015 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 07/08/2015 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 07/08/2015 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 07/08/2015 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 07/08/2015 | |||
| VERIFY TAX LOT | N | SGN | 07/08/2015 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 07/08/2015 | |||
| VIOLATIONS SEARCH | N | SGN | 07/08/2015 | |||
| FOLDER REVIEW | N | SGN | 07/08/2015 | |||
| ELEVATOR OBJ: OPEN EVCAT ELEVATOR VIOLATION | N | SGN | 03/27/2020 | |||
| PW-7-REQUESTS-ENTIRE-BLDG-PLUMBING-S/O-FOR-THE- REMAINING-USES-IN-THE-CELLAR-IS-REQUIRED | N | SGN | 08/26/2020 |
ELEVATOR OBJ: OPEN PVT VIO N SGN 01/25/2021
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit OpenItemsOnly
Signoff Reset
Redisplay
| Premises:400WEST61STREETMANHATTAN JobNo:121193181 BIN:1089723 Block:1171 Lot:7513 JobType:NB–NEWBUILDING | ||||||
| 32OPENITEMSOF93REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 07/17/2015 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 07/17/2015 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 07/17/2015 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 07/17/2015 | |||
| CERTIFICATE OF OCCUPANCY | N | SGN | 07/17/2015 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 07/17/2015 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 07/17/2015 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 07/17/2015 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 07/17/2015 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 07/17/2015 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 07/17/2015 | |||
| SITE SURVEY: FINAL | N | SGN | 07/17/2015 | |||
| BPP: FINAL SIGNOFF | N | SGN | 07/17/2015 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 07/17/2015 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 07/17/2015 | |||
| STREET TREE SIGNOFF | N | SGN | 07/17/2015 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 07/17/2015 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 07/17/2015 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 07/17/2015 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 07/17/2015 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 07/17/2015 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 07/17/2015 | |||
| VERIFY TAX LOT | N | SGN | 07/17/2015 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 07/17/2015 | |||
| VIOLATIONS SEARCH | N | SGN | 07/17/2015 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 07/17/2015 | |||
| FOLDER REVIEW | N | SGN | 07/17/2015 | |||
| FDNY APPROVAL FOR ELEVATOR OPENING INTOREFUSE ROOM. | T | SGN | 08/18/2016 | |||
| PA SPACE – EATING AND DRINKINGESTABLISHMENT FIRST FLOOR APPROVAL 560PERSONS | T | SGN | 10/17/2019 | |||
| CLARIFICATION-FOR-PW-7-REQUEST-IS-REQUIRED | N | SGN | 10/29/2019 | |||
| LASTEST-PW-7-REQUESTED-TO-REMOVE-2ND-FL-NOTE-(LESS-HOIST- LINE-UNIT)-PL-GRANTED-2ND-FL-(LESS-HOIST-LINE-UNIT)-DATED- 05/30/19 | N | SGN | 10/31/2019 | |||
| PW-7-REQUEST-DATED-12/06/19-REQUIRES-PL-&-CONSTRUCTION- UPDATE-FOR-ALL-CHANGES | N | SGN | 12/06/2019 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
| Premises:633WEST59STREETMANHATTAN JobNo:121193458 BIN:1089374 Block:1171 Lot:157 JobType:NB–NEWBUILDING | ||||||
| 32OPENITEMSOF85REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 09/11/2015 | |||
| SITE SURVEY: FINAL | N | SGN | 09/11/2015 | |||
| BPP: FINAL SIGNOFF | N | SGN | 09/11/2015 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 09/11/2015 | |||
| STREET TREE SIGNOFF | N | SGN | 09/11/2015 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 09/11/2015 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 09/11/2015 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 09/11/2015 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 09/11/2015 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 09/11/2015 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 09/11/2015 | |||
| VERIFY TAX LOT | N | SGN | 09/11/2015 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 09/11/2015 | |||
| VIOLATIONS SEARCH | N | SGN | 09/11/2015 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 09/11/2015 | |||
| FOLDER REVIEW | N | SGN | 09/11/2015 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 09/18/2015 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 09/18/2015 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 09/18/2015 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 09/18/2015 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 09/18/2015 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 09/18/2015 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 09/18/2015 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 09/18/2015 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 09/18/2015 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 09/18/2015 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 09/18/2015 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 09/18/2015 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 09/18/2015 | |||
| FDNY APPROVAL FOR ELEVATOR OPENING INTOREFUSE ROOM | T | SGN | 08/18/2016 | |||
| FEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34) | T | SGN | 02/05/2019 | |||
| FEMA ELEVATION CERT (086-0-33)- FINISHED CONSTRUCTION | T | SGN | 02/05/2019 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval
Permit
AllItems
OpenItemsOnly
| Premises:401WEST31STREETMANHATTAN JobNo:121204295 BIN:1089694 Block:729 Lot:51 JobType:NB–NEWBUILDING | ||||||
| 25OPENITEMSOF25REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| ENVIRONMENTAL RESTRICTIONS – OER NOTICE OF SATISFACTION | T | SGN | 12/13/2017 | |||
| FEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34) | T | SGN | 12/13/2017 | |||
| CERTIFICATE OF OCCUPANCY | N | SGN | 12/13/2017 | |||
| SITE SURVEY: FINAL | N | SGN | 12/13/2017 | |||
| BPP: FINAL SIGNOFF | N | SGN | 12/13/2017 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 12/13/2017 | |||
| STREET TREE SIGNOFF | N | SGN | 12/13/2017 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 12/13/2017 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 12/13/2017 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 12/13/2017 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 12/13/2017 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 12/13/2017 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 12/13/2017 | |||
| VERIFY TAX LOT | N | SGN | 12/13/2017 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 12/13/2017 | |||
| VIOLATIONS SEARCH | N | SGN | 12/13/2017 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 12/13/2017 | |||
| DOB NOW REVIEW COMPLETE | N | SGN | 12/13/2017 | |||
| FOLDER REVIEW | N | SGN | 12/13/2017 | |||
| FIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF | N | SGN | 04/16/2019 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 04/16/2019 | |||
| SEWER/HOUSE CON SIGNOFF: DEP HC 021 | N | SGN | 04/16/2019 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 04/16/2019 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 04/16/2019 |
ELEVATOR JOB SIGNOFF N SGN 04/16/2019
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or
| Premises:501WEST30STREETMANHATTAN JobNo:121324290 BIN:1089323 Block:702 Lot:10 JobType:NB–NEWBUILDING | ||||||
| 28OPENITEMSOF121REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 07/13/2012 | |||
| SITE SURVEY: FINAL | N | SGN | 07/13/2012 | |||
| BPP: FINAL SIGNOFF | N | SGN | 07/13/2012 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 07/13/2012 | |||
| STREET TREE SIGNOFF | N | SGN | 07/13/2012 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 07/13/2012 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 07/13/2012 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 07/13/2012 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 07/13/2012 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 07/13/2012 | |||
| VERIFY TAX LOT | N | SGN | 07/13/2012 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 07/13/2012 | |||
| VIOLATIONS SEARCH | N | SGN | 07/13/2012 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 07/13/2012 | |||
| FOLDER REVIEW | N | SGN | 07/13/2012 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 09/07/2012 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 09/07/2012 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 09/07/2012 | |||
| RESTRICTION: EASEMENT AGREEMENT | T | SGN | 09/07/2012 | |||
| BOILER (BL) SIGNOFF | N | SGN | 09/07/2012 | |||
| RESTRICTION: RESTRICTIVE DECLARATION | N | SGN | 09/07/2012 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 01/19/2016 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 01/19/2016 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 08/25/2016 | |||
| FIRE SUPP ANSUL APPROVL: FD-FSS | T | SGN | 11/15/2018 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 11/15/2018 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 11/15/2018 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 11/15/2018 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Ease / Deed / Fee Text
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
| Premises:17WESTENDAVENUEMANHATTAN JobNo:121324717 BIN:1088870 Block:1171 Lot:164 JobType:NB–NEWBUILDING | ||||||
| 26OPENITEMSOF101REQUIREDFORJOPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 07/27/2012 | |||
| SITE SURVEY: FINAL | N | SGN | 07/27/2012 | |||
| BPP: FINAL SIGNOFF | N | SGN | 07/27/2012 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 07/27/2012 | |||
| STREET TREE SIGNOFF | N | SGN | 07/27/2012 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 07/27/2012 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 07/27/2012 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 07/27/2012 | |||
| VERIFY TAX LOT | N | SGN | 07/27/2012 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 07/27/2012 | |||
| VIOLATIONS SEARCH | N | SGN | 07/27/2012 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 07/27/2012 | |||
| FOLDER REVIEW | N | SGN | 07/27/2012 | |||
| TRANSIT AUTHORITY/MTA/PANYNJ APPROVAL | N | SGN | 08/29/2012 | |||
| ADDRESS: NEW HOUSE NUMBER APPROVED | N | SGN | 08/29/2012 | |||
| TAX LOT: FINAL LOT NUMBER ISSUED | N | SGN | 08/29/2012 | |||
| EQUIPMENT USE PERMITS | N | SGN | 08/29/2012 | |||
| FIRE SUPPRESSION SYSTEM (FP) SIGNOFF | N | SGN | 08/29/2012 | |||
| HPD: INCLUSIONARY HOUSING ELIG. CERT | T | SGN | 09/07/2012 | |||
| PILES: FINAL PILE PLAN/CREOSOTE LETTER | T | SGN | 12/06/2012 | |||
| SCHEDULE “A” TO BE REVISED BEFORE SIGN OFF. | T | SGN | 06/27/2013 | |||
| TO BE SIMULTANEOUSLY SIGNOFF WITH ALT1122605047 AND ALT II 122040870,121961190FOR SCHOOL FITOUT WORK. | T | SGN | 04/27/2016 | |||
| SCHEDULE A FROM ALT1 122605047 TO COORDINATE THE NB SCH A. | T | SGN | 04/27/2016 | |||
| SIMULTANEOUSLY SIGNOFF W NB 122605047 & | T | SGN | 05/24/2016 | |||
| OER NNO TCO SCHOOL | N | SGN | 07/27/2016 | |||
| $100-TCO-RENEWAL-FEE-IS-REQUIRED | N | SGN | 12/15/2020 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Ease / Deed / Fee Text
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
| Premises:53WEST53STREETMANHATTAN JobNo:121327224 BIN:1090777 Block:1269 Lot:6 JobType:NB–NEWBUILDING | ||||||
| 24OPENITEMSOF71REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 01/07/2013 | |||
| SITE SURVEY: FINAL | N | SGN | 01/07/2013 | |||
| BPP: FINAL SIGNOFF | N | SGN | 01/07/2013 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 01/07/2013 | |||
| STREET TREE SIGNOFF | N | SGN | 01/07/2013 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 01/07/2013 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 01/07/2013 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 01/07/2013 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 01/07/2013 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 01/07/2013 | |||
| VERIFY TAX LOT | N | SGN | 01/07/2013 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 01/07/2013 | |||
| VIOLATIONS SEARCH | N | SGN | 01/07/2013 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 01/07/2013 | |||
| FOLDER REVIEW | N | SGN | 01/07/2013 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 06/25/2013 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 06/25/2013 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 06/25/2013 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 06/25/2013 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 06/25/2013 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 06/25/2013 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 06/25/2013 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 06/25/2013 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 06/25/2013 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.
| Premises:217WEST57STREETMANHATTAN JobNo:121328205 BIN:1090180 Block:1029 Lot:7502 JobType:NB–NEWBUILDING | ||||||
| 30OPENITEMSOF70REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 11/23/2012 | |||
| SITE SURVEY: FINAL | N | SGN | 11/23/2012 | |||
| BPP: FINAL SIGNOFF | N | SGN | 11/23/2012 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 11/23/2012 | |||
| STREET TREE SIGNOFF | N | SGN | 11/23/2012 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 11/23/2012 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 11/23/2012 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 11/23/2012 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 11/23/2012 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 11/23/2012 | |||
| VERIFY TAX LOT | N | SGN | 11/23/2012 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 11/23/2012 | |||
| VIOLATIONS SEARCH | N | SGN | 11/23/2012 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 11/23/2012 | |||
| FOLDER REVIEW | N | SGN | 11/23/2012 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 01/08/2013 | |||
| FIRE SUPP ANSUL APPROVL: FD-FSS | T | SGN | 01/08/2013 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 01/08/2013 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 01/08/2013 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 01/08/2013 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 01/08/2013 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 01/08/2013 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 01/08/2013 | |||
| FIRE SUPPRESSION SYSTEM (FP) SIGNOFF | N | SGN | 01/08/2013 | |||
| BOILER (BL) SIGNOFF | N | SGN | 01/08/2013 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 01/08/2013 | |||
| COORDINATE FINAL CONFIGURATION OF THE TENANT SPACES FILED UNDER SEPARATE APPLICATION WITH THIS NB APPLICATION | T | SGN | 10/03/2018 | |||
| PRIOR TO C OF O TEMPORARY EGRESS SHALL BE REVERTED BACK TO THE APPROVED EGRESS DATED 11/15/18 (PAGES A-034.04, A- 035.04, A-042.03) (CELLAR, GROUND FLOOR, 7TH FLOOR) | T | SGN | 10/22/2019 | |||
| PRIOR TO NEXT TCO RENEWAL OR FINAL CO, PLEASE CORRECT SCHEDULE A TO INCLUDE THE #OF PROPOSED APARTMENTS ON 020. | N | SGN | 12/31/2020 | |||
| PW7-REQUESTS-ADDITION-OF-SC1-&-5TH-FL-USE-FOR-(KITCHEN)-PL- SIGN-OFF-IS-REQUIRED-AS-WELL-AS-PROJECT-ADVOCATE- APPROVAL-FOR-ADDITION | N | SGN | 01/13/2021 |
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
| Premises:41EAST60STREETMANHATTAN JobNo:121329213 BIN:1090526 Block:1375 Lot:7504 JobType:NB–NEWBUILDING | ||||||
| 25OPENITEMSOF68REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 12/13/2012 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 12/13/2012 | |||
| STREET TREE SIGNOFF | N | SGN | 12/13/2012 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 12/13/2012 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 12/13/2012 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 12/13/2012 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 12/13/2012 | |||
| VERIFY TAX LOT | N | SGN | 12/13/2012 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 12/13/2012 | |||
| VIOLATIONS SEARCH | N | SGN | 12/13/2012 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 12/13/2012 | |||
| FOLDER REVIEW | N | SGN | 12/13/2012 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 01/18/2013 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 01/18/2013 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 01/18/2013 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 01/18/2013 | |||
| BOILER (BL) SIGNOFF | N | SGN | 01/18/2013 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 01/18/2013 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 01/18/2013 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 01/18/2013 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 07/26/2013 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 07/26/2013 | |||
| ELEVATOR OBJ: OPEN PVT VIO | N | SGN | 02/04/2021 | |||
| ELEVATOR OBJ: OPEN BUILD ELEVATOR APPLICATION | N | SGN | 02/04/2021 |
$100-TCO-RENEWAL-FEE-IS-REQUIRED N SGN 02/05/2021
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Ease / Deed / Fee Text
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or
| Premises:41EAST60STREETMANHATTAN JobNo:121329213 BIN:1090526 Block:1375 Lot:7504 JobType:NB–NEWBUILDING | ||||||
| 25OPENITEMSOF68REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 12/13/2012 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 12/13/2012 | |||
| STREET TREE SIGNOFF | N | SGN | 12/13/2012 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 12/13/2012 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 12/13/2012 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 12/13/2012 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 12/13/2012 | |||
| VERIFY TAX LOT | N | SGN | 12/13/2012 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 12/13/2012 | |||
| VIOLATIONS SEARCH | N | SGN | 12/13/2012 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 12/13/2012 | |||
| FOLDER REVIEW | N | SGN | 12/13/2012 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 01/18/2013 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 01/18/2013 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 01/18/2013 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 01/18/2013 | |||
| BOILER (BL) SIGNOFF | N | SGN | 01/18/2013 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 01/18/2013 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 01/18/2013 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 01/18/2013 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 07/26/2013 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 07/26/2013 | |||
| ELEVATOR OBJ: OPEN PVT VIO | N | SGN | 02/04/2021 | |||
| ELEVATOR OBJ: OPEN BUILD ELEVATOR APPLICATION | N | SGN | 02/04/2021 |
$100-TCO-RENEWAL-FEE-IS-REQUIRED N SGN 02/05/2021
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
Some items may not be required for your specific work filing.
Ease / Deed / Fee Text
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
ApprovalPermit
Signoff
AllItems
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or
| Premises:9DEKALBAVENUEBROOKLYN JobNo:320914338 BIN:3000370 Block:149 Lot:100 JobType:NB–NEWBUILDING | ||||||
| 38OPENITEMSOF39REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 07/01/2014 | |||
| SITE SURVEY: FINAL | N | SGN | 07/01/2014 | |||
| BPP: FINAL SIGNOFF | N | SGN | 07/01/2014 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 07/01/2014 | |||
| STREET TREE SIGNOFF | N | SGN | 07/01/2014 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 07/01/2014 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 07/01/2014 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 07/01/2014 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 07/01/2014 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 07/01/2014 | |||
| VERIFY TAX LOT | N | SGN | 07/01/2014 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 07/01/2014 | |||
| VIOLATIONS SEARCH | N | SGN | 07/01/2014 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 07/01/2014 | |||
| FOLDER REVIEW | N | SGN | 07/01/2014 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 07/06/2016 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 07/06/2016 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 07/06/2016 | |||
| FA – FDNY APPROVAL : FD-FAA | N | SGN | 07/06/2016 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 07/06/2016 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 07/06/2016 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 07/06/2016 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 07/06/2016 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 07/06/2016 | |||
| DETECTOR:SMOKE-CERT. OF INSTALLATION | N | SGN | 07/06/2016 | |||
| EQUIPMENT USE PERMITS | N | SGN | 07/06/2016 | |||
| FUEL BURNING (FB) SIGNOFF | N | SGN | 07/06/2016 | |||
| FUEL STORAGE (FS) SIGNOFF | N | SGN | 07/06/2016 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 07/06/2016 | |||
| DEMOLITION SIGN OFF PRIOR TO TCO | N | SGN | 07/06/2016 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 11/18/2016 | |||
| TAX LOT: FINAL LOT NUMBER ISSUED | N | SGN | 08/03/2017 | |||
| FIRE SUPP ANSUL APPROVL: FD-FSS | T | SGN | 05/31/2018 | |||
| FIRE SUPPRESSION SYSTEM (FP) SIGNOFF | N | SGN | 05/31/2018 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF FOR LOUNGE ON 5TH FLOOR | T | SGN | 08/26/2020 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF FOR LOUNGE ON 5TH FLOOR | T | SGN | 08/26/2020 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF FOR POOLS AND TERRACE AREAS | T | SGN | 08/26/2020 | |||
| THE REQUIRED ALT1 FILING ON 189SCHERMERHORN SHALL BE FILED & APPROVEDISSUANCE ON THIS DEVELOPMENT AND ANY TCO | T | SGN | 08/26/2020 |
| Premises:9HOYTSTREETBROOKLYN JobNo:321197058 BIN:3329438 Block:157 Lot:1 JobType:A1–ALTERATIONTYPE1 | ||||||
| 35OPENITEMSOF65REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRITO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| CERTIFICATE OF OCCUPANCY | N | SGN | 01/07/2016 | |||
| COST AFFIDAVIT (FINAL): PW3 | N | SGN | 01/07/2016 | |||
| SITE SURVEY: FINAL | N | SGN | 01/07/2016 | |||
| STREET TREE SIGNOFF | N | SGN | 01/07/2016 | |||
| AS-BUILT ENERGY ANALYSIS (EN2) | N | SGN | 01/07/2016 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 01/07/2016 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 01/07/2016 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 01/07/2016 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 01/07/2016 | |||
| VERIFY TAX LOT | N | SGN | 01/07/2016 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 01/07/2016 | |||
| VIOLATIONS SEARCH | N | SGN | 01/07/2016 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 01/07/2016 | |||
| FOLDER REVIEW | N | SGN | 01/07/2016 | |||
| PLUMBING (PL) SIGNOFF | N | SGN | 01/08/2016 | |||
| CONSTRUCTION (OT) SIGNOFF | N | SGN | 01/08/2016 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 01/11/2016 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 01/11/2016 | |||
| TAX LOT: FINAL LOT NUMBER ISSUED | N | SGN | 10/03/2017 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 10/03/2017 | |||
| MECHANICAL (MH) SIGNOFF | N | SGN | 10/03/2017 | |||
| CURB CUT (CC) SIGNOFF | N | SGN | 10/03/2017 | |||
| EQUIPMENT USE PERMITS | N | SGN | 10/03/2017 | |||
| BPP: FINAL SIGNOFF | N | SGN | 10/03/2017 | |||
| DOB – ZONING DIAGRAM (ZD1) | T | SGN | 10/03/2017 | |||
| FIRE ALARM TEST | N | SGN | 10/03/2017 | |||
| FIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF | N | SGN | 01/31/2018 | |||
| ADDRESS: NEW HOUSE NUMBER APPROVED | N | SGN | 01/31/2018 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 01/31/2018 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 01/31/2018 | |||
| FIRE ALARM: AS-BUILT PLANS | N | SGN | 01/31/2018 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 01/31/2018 | |||
| DETECTOR:CARBON MONOXIDE-CERT.OF INSTALL | N | SGN | 01/31/2018 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 08/08/2018 |
ELEVATOR OBJ: OPEN ELV APP N SGN 02/01/2021
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
Some items may not be required for your specific work filing.
EnterCriteriaforRequiredItemDisplay
| Premises:23-1544DRIVEQUEENS JobNo:420655954 BIN:4005166 Block:437 Lot:7502 JobType:NB–NEWBUILDING | ||||||
| 39OPENITEMSOF68REQUIREDFORJOBPRIORTOSIGNOFFONLY | WHORECV+ | PRI TO | REQUIREDDATE | RECEIVEDDATE | DATE CERTIFIED | WAIVED |
| STREET TREES SITE PLAN | T | SGN | 03/22/2016 | |||
| FEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34) | T | SGN | 03/22/2016 | |||
| CERTIFICATE OF OCCUPANCY | N | SGN | 03/22/2016 | |||
| SITE SURVEY: FINAL | N | SGN | 03/22/2016 | |||
| BPP: FINAL SIGNOFF | N | SGN | 03/22/2016 | |||
| DEMOLITION (DM) JOB SIGNOFF | N | SGN | 03/22/2016 | |||
| STREET TREE SIGNOFF | N | SGN | 03/22/2016 | |||
| PRELIMINARY COMMISSIONING REPORT CERTIFICATION | T | SGN | 03/22/2016 | |||
| FINAL PLUMBING SIGNOFF | N | SGN | 03/22/2016 | |||
| FINAL ELEVATOR SIGNOFF | N | SGN | 03/22/2016 | |||
| FINAL ELECTRICAL SIGNOFF | N | SGN | 03/22/2016 | |||
| FINAL CONSTRUCTION SIGNOFF | N | SGN | 03/22/2016 | |||
| CO OBJ: VERIFY ADDRESS-TOPO STAMP | N | SGN | 03/22/2016 | |||
| VIOLATIONS SEARCH | N | SGN | 03/22/2016 | |||
| OPEN APPLICATIONS SEARCH | N | SGN | 03/22/2016 | |||
| FOLDER REVIEW | N | SGN | 03/22/2016 | |||
| FIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF | N | SGN | 04/08/2016 | |||
| ADDRESS: NEW HOUSE NUMBER APPROVED | N | SGN | 04/08/2016 | |||
| FIRE PROTECTION PLAN (FPP): FDNY APPROVAL | N | SGN | 04/08/2016 | |||
| SWIMMING POOL: DOH APPROVAL | N | SGN | 04/08/2016 | |||
| SWIMMING POOL: DEP APPROVAL | N | SGN | 04/08/2016 | |||
| BPP-PARKS: PLANT NEW TREE | T | SGN | 04/08/2016 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF | N | SGN | 04/08/2016 | |||
| SPRINKLER (SP) SIGNOFF | N | SGN | 04/08/2016 | |||
| STANDPIPE (SD) SIGNOFF | N | SGN | 04/08/2016 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 04/08/2016 | |||
| MARQUEE (OT) SIGNOFF | N | SGN | 04/08/2016 | |||
| PA APPLICATION REQUIRED FOR 62ND FLR OUT-DOOR REC AREA. | T | SGN | 04/08/2016 | |||
| C.C. APPLICATION REQUIRED FOR ONE OF THE PROPOSED C.C’S ON 44TH RD. | T | SGN | 04/08/2016 | |||
| REQUIRED; ALT-1 APPLICATION FOR EXST’GBLDG TO RECORD AMENDED METES AND BOUNDS& TO INDICATE ANY AND ALL EASEMENTSRESTRIC. DEC’S ETC ON THE ZONING LOT | T | SGN | 05/31/2016 | |||
| PW1 SECTION 13 SHALL BE REVISED FORBUILDING HEIGHT.PW1 SECTION 17 SHALL BE REVISED FORTENTATIVE TAX LOT NUMBERS. | T | SGN | 05/30/2018 | |||
| PW1 SECTION 1 TO BE REVISED FOR WORK ONFLOORS. (NO MZ4) | T | SGN | 05/30/2018 | |||
| ELEVATOR JOB SIGNOFF | N | SGN | 10/16/2018 | |||
| FIRE SUPPRESSION SYSTEM (FP) SIGNOFF | N | SGN | 10/19/2018 | |||
| PLACE OF ASSEMBLY (PA) SIGNOFF (DINING AREA IN THE CELLAR) | T | SGN | 10/19/2018 | |||
| ELEVATOR OBJ: OPEN BUILD ELEVATOR APPLICATIONS | N | SGN | 01/12/2021 |
PARTIAL TR1 FOR POST-INSTALLED ANCHORS EXCLUDING HOIST N SGN 01/23/2021
LINE.
| BOROUGH COMMENT: CELLAR LESS LAUNDRY & RETAIL-1ST FLOOR LESS RETAIN, VALET PARKING, PET BATH: 3RD & 4TH FLOOR LESSHOIST & AMENITIES-8TH-19TH FLOORS LESSHOIST;36TH FL LESS HOILT & ENTIRE ROOF | N | SGN | 01/25/2021 |
APPLICANT NOTE:MUST SHOW PROGRESS IN SIGNING OFF THE OPEN APPLICATION PRIO TO TCO EXPIRATION
N SGN 01/25/2021
(+)N= Can be received by clerical staff; T= Can only be received by a plan examiner
EnterCriteriaforRequiredItemDisplay
DisplayItemsRequiredPriorTo: WhichItemsShouldBeDisplayed?
Approval AllItems
Permit
Signoff
OpenItemsOnly
Reset
Redisplay
If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.